Question: Need help answering the Estimating the probability of a completion date problem. Estimating the Probability of a Completion Date Step 1. Calculate the variance of

Need help answering the Estimating the probability of a completion date problem. Need help answering the Estimating the
Need help answering the Estimating the
Estimating the Probability of a Completion Date Step 1. Calculate the variance of completion times from the most optimistic and most pessimistic completion times and insert in table. Step 2. Find the total variance for each path in the network. The total variance along a path is simply the sum of the individual variances of activities on the path. Path 1: Total Variance: Path 2: Total Variance: Step 3. Find the probability of a scheduled completion date of less than 17 days. a. Sketch out the project mean and project standard deviation assuming a normal distribution with mean and standard deviation found above. Remember the standard deviation is the square root of the variance! b. Now, find the z value for a scheduled completion date of day 17 on the critical path using the formula: D-ET P Using the z value, a probability value can be found. PERT Problem Analyze the same problem with probabilistic activity times given. Activity Immediate Most Most Most Expected Variance Predecessors Optimistic Likely Likely Pessimistic Time Time Time Time (ET) A 2 3 B A 3 4 B 1 2 D B 3 5 E 3 4 5 F D 3 3 4 G E.F 1 2 3 Step 1. Calculate the expected time for each activity. Step 2. Identify the different paths in the network and total activity time on path. (Use the expected times of each activity for this calculation). Path 1: Time: Path 2: Time: Step 3. Identify the critical path(s) on the network. The critical path is the one having the longest total activity times AND also has no slack. Critical Path: Total Time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!