Question: NEED HELP ASAP! DUE Date: Today Later than 1 1 : 5 9 pm Prepare a comprehensive Terms of Reference ( ToR ) document outlining

NEED HELP ASAP! DUE Date: Today Later than 11:59pm
Prepare a comprehensive Terms of Reference (ToR) document outlining the project scope, methodology, deliverables, and timeline. Refer to the attached document for the sample project details.
Project Details: RENOVATION OF VIRRAMALL PROJECT
Project Area: 8,112 square meters
DESCRIPTION OF THE CURRENT CONDITION:
Architectural:
Existing Interior and Exterior Wall
Non-existent Ceiling
Existing Roof
Existing Chipped Tiles and Tile topping
Existing Mullion and Curtain Wall
Structural:
Existing Trusses Angle Bars and C-Chanels
Existing Tension Rods
Bolted Connections
Welded Connections
Mechanical:
Has existing Pump Room for the Cistern Tank and Fire Storage tank however not included in the property.
Existing Fire Protection Pipes
Non-existent of sprinklers
Existing Fire Hose Cabinets
Existing Ventilation Pipes
Electrical:
Existing generator set and transformer.
Existing supply from and check meter from the Meralco
Existing Main Distribution Panel
Existing meter centers but not all are working.
Existing panelboards but not all are working.
Non-existence of lighting fixtures and devices
Most of the wires are cut and pulled out.
Non-existent of smoke detectors/heat detectors
Sanitary:
Existing Comfort Room with stub-outs.
Existing Water Meter and Gate Valve
Existing Pipeline for Water line
Has existing STP but not within property.
Pipe for Sewerage going to existing STP is not within the property.
Removed Floor and Ground Cleanouts
Nonexistent Fixtures
Has area drains and backflow preventor for surface water.
Rear roof has downspouts and gutter.
Cistern tank is not within the property.
Has existing deep well and centralised grease tank
COMMERCIAL LEASABLE AREA =1041SQM
WAREHOUSE LEASABLE AREA =3066 SQM
5 UNITS -105 SQM
RESTROOM =144 SQM
4 UNITS -129 SQM VIRRA MALL
Dr Arcadio Santos Ave, Paraaque,1700 Metro Manila
ANNEX B
NEED HELP ASAP! DUE Date: Today Later than 1 1 :

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!