Question: NEED HELP ASAP!!! Process Safety & Risk Management QUESTION: Please add necessary COMPONENTS into the P&ID diagram given to achieve the safety & process objectives
Task 2: Failure Mode Effect Analysis (FMEA) (TG - Temperature gauge, T - Temperature indicator) As shown in the diagram above, water is stored in a container (FV-1) for supplying hot water for a heat exchanger (E2) downstream. In the container, water is heated using an electrical heater (E1) and maintained at a temperature 80C in the container. Water pump (P1) needs to supply water at a flow rate of 400L/min. Please finish the following tasks with your team. (1) Some safety and process controls (BPCS, valves, instruments, etc.) are neglected in the diagram. Please apply your engineering knowledge, add the necessary components to achieve the safety and process objectives of such process