Question: Need help in creating and AoN diagram (Activity of Node). This is a Project Management Assignment. The activity table is provided below with all the

Need help in creating and AoN diagram (Activity of Node). This is a Project Management Assignment. The activity table is provided below with all the details.

Include the ES (early start), EF (early finish), LS (late start), LF (late finish), and Slack in each work package box, as well as the total project duration and clearly identify the critical path.

I have an answer, but where can I place activity 1.2 Could you please clarify and give updated answer if any change is required please?

Need help in creating and AoN diagram (Activity of Node). This isa Project Management Assignment. The activity table is provided below with all

Work package Duration Predecessors (days) 1.1 Demolition: remove all old appliances, 2 None cabinets, and flooring 1.2 Demolition: haul away all materials/debris 1.1 2.1 Order cabinets 2 1.2 2.2 Order sink/faucet 1.2 2.3 Order appliances 1.2 2.4 Order paint 1.2 3.1 Create countertop subcontract 2.1 & 2.2 3.2 Create tile subcontract 2.3 3.3 Create painting subcontract 2.4 4.1 Install cabinets 3.1 4.2 Install countertop 3.2 & 4.1 4.3 Install tile floors 4.2 4.4 Install sink/faucet 4.3 4.5 Install appliances 3.3 & 4.3 5.1 Paint walls & ceiling 4.4 & 4.5 6.1 PM Inspection/punchlist 5.1 6.2 Walk through / acceptance 6.1A B CDE F G H K L MNOP Q R S U V W X Y Z AA AB AC AD AE AF A 2 2.1 O Order Cabinets 2 2 4 4 3.1 5 4.1 8 12 4.4 13 Create countertop Install Install subcontract 0 Cabinets 2 2.2 sink\\faucet 4 1 5 3 8 13 1 14 1 Order sink \\faucet 0 11 2 3 0 Demolition Vertical (Value) Axis Major Gridlines 0 2 2 2 2.3 3 3.2 8 4.2 4.3 12 14 5.1 16 16 6.1 17 17 6.2 Create tile 18 Install Install tile Paint walls PM Inspection 3 Order appliances 3 Walk through subcontract 0 Countertop floors 0 and ceiling 0 \\punchlist O /acceptance 1 6 6 2 8 9 12 14 2 16 16 1 17 17 1 18 2 2.4 3 3.3 12 4.5 14 Create painting Install 8 Order paint subcontract appliances ES ID EF 10 1 11 11 1 12 12 2 14 SLACK Description LS DUR LF Total Duration = 18 Days Critical Path 1.1 -2.1 - 3.1 -4.1 -4.2-4.3-4.5-5.1-6.1-6.2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!