Question: Need help on #12 using the information on question 11. PROBLEMS 11. Arwin Textile Mills produces two types of cotton clothdenim and corduroy. Corduroy is

Need help on #12 using the information on question 11.

Need help on #12 using the information on

PROBLEMS 11. Arwin Textile Mills produces two types of cotton clothdenim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such, requires 7.5 pounds of raw cotton per yard, whereas denim requires 5 pounds of raw cotton per yard. A yard of corduroy requires 3.2 hours of processing time; a yard of denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 510 yards per month. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month. The manufacturer makes a profit of $2.25 per yard of denim and $3.10 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce to maximize profit. a. Formulate a linear programming model for this problem. b. Transform this model into standard form. 12. Solve the model formulated in problem 11 for the Irwin Textile Mills graphically. a. How much extra cotton and processing time are left over at the optimal solution? Is the demand for corduroy met? b. What is the effect on the optimal solution if the profit per yard of denim is increased from $2.25 to $3.00? What is the effect if the profit per yard of corduroy is increased from $3.10 to $4.00 c. What will be the effect on the optimal solution if Irwin Mills could obtain only 6,000 pounds of cotton per month

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!