Question: Need help with 28-31 please The BOM structure and Material Requirements Plan for product J using lot-for-lot sizing technique are shown below. K (2) L(x)

Need help with 28-31 please Need help with 28-31 please The BOM structure and
Need help with 28-31 please The BOM structure and
The BOM structure and Material Requirements Plan for product J using lot-for-lot sizing technique are shown below. K (2) L(x) L(X) M(2) (2) 2 Week 3 4 500 5 300 300 400 J 1 Gross Requirements Beginning on hand Inventory Net Requirements Ending On hand Inventory Planned Order Receipts Planned Order Releases 28) f the lead time for component K is 1 week, what is K's gross requirement on Week 3 A) 300 B) 400 C) 600 D) Cannot be determined with the information provided 29) If each unit of product contains 6 units of component L, the value of "X" on the BOM structure is: A) 1 B) 3 C) 5 D) 61 PROBLEM 4 (10 POINTS) On the previous problem, The Operations Manager decides to use the Economic Order Quantity Lot sizing strategy. If the EOQ is 500 units: 30) What are the net requirements on week 4 (B Value) A) 100 B) 400 C) 500 D) 800 31) What is the planned order release on week 2 (D value) A) O B) 300 C) 400 D) 500

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!