Question: Need help with question 3, 4 and 5 QUESTION 1. A production line is to be designed for a job with three tasks. The task
Need help with question 3, 4 and 5
QUESTION 1. A production line is to be designed for a job with three tasks. The task times are 0.4 minutes, 1.2 minutes, and 0.5 minutes. The maximum cycle time of the process in minutes is: 2.1
QUESTION 2 A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. The minimum cycle time of the process in minutes is: 1.4
Need help with question 3 ,4, 5
QUESTION 3 Chapter 6, Problem 1 What are the minimum and maximum cycle times?
2.4 minutes, 18 minutes
18 minutes, 450 minutes
2.4 minutes, 450 minutes
1 minutes, 18 minutes
QUESTION 4
If we want to achieve the maximum output rate of the process, what is the minimum number of workstations needed?
QUESTION 5
What cycle time will provide an output rate of 125 units per day?