Question: Net Present Value Method, Internal Rate of Return Method, and Analysis The management of Advanced Alternative Power Inc. is considering two capital investment projects.

Net Present Value Method, Internal Rate of Return Method, and Analysis The management of Advanced Alternative Power Inc. is considering two capital investment projects. The estimated net cash flows from each project are as follows: Wind Turbines Biofuel Equipment $400,000 Year 1 $200,000 2 200,000 400,000 3 200,000 400,000 4 200,000 400,000 Present Value of an Annuity of $1 at Compound Interest Year 6% 10% 12% 15% 20% 1 0.943 0.909 0.893 0.870 0.833 2 1.833 1.736 1.690 1.626 1.528 3 2.673 2.487 2.402 2.283 2.106 4 3.465 3.170 3.037 2.855 2.589 5 4.212 3.791 3.605 3.352 2.991 6 4.917 4.355 4.111 3.784 3.326 7 5.582 4.868 4.564 4.160 3.605 8 6.210 5.335 4.968 4.487 3.837 9 6.802 5.759 5.328 10 7.360 6.145 5.650 4.772 5.019 4.031 4.192 The wind turbines require an investment of $517,800, while the biofuel equipment requires an investment of $1,142,000. No residual value is expected from either project. Required: 1a. Compute the net present value for each project. Use a rate of 10% and the present value of an annuity of $1 in the table above. If required, use the minus sign to indicate a negative net present value. If Check My Work Previous
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts