Question: New Exercise Bank Content Qu . 1 3 - 1 6 Jake's Machine Shop contains a grinder for sharpening the machine cutting tools. A decision
New Exercise Bank Content Qu
Jake's Machine Shop contains a grinder for sharpening the machine cutting tools. A decision must now be made on the speed at
which to set the grinder. The grinding time required by a machine operator to sharpen the cutting tool has an exponential distribution,
where the mean can be set at minute, or minutes, or minutes, depending upon the speed of the grinder. The running and
maintenance costs go up rapidly with the speed of the grinder, so the estimated cost per minute is $ for providing a mean of
minute, and $ for a mean of minutes, and $ for a mean of minutes. The machine operators arrive randomly to sharpen
their tools at a mean rate of one every two minutes. The estimated cost of an operator being away from his or her machine to the
grinder is $ per minute.
Click here for the Excel Data File
Obtain the various measures of performance for this queueing system for each of the three alternative speeds for the grinder. Set
minutes in the Excel template for the waitingtime probabilities.
a Determine the performance for this queueing system for minute.
Note: Round your answers to decimal place. Jake's Machine Shop contains a grinder for sharpening the machine cutting tools. A decision must now be made on the speed at
which to set the grinder. The grinding time required by a machine operator to sharpen the cutting tool has an exponential distribution,
where the mean can be set at minute, or minutes, or minutes, depending upon the speed of the grinder. The running and
maintenance costs go up rapidly with the speed of the grinder, so the estimated cost per minute is $ for providing a mean of
minute, and $ for a mean of minutes, and $ for a mean of minutes. The machine operators arrive randomly to sharpen
their tools at a mean rate of one every two minutes. The estimated cost of an operator being away from his or her machine to the
grinder is $ per minute.
b Determine which grinder speed minimizes the expected total cost for minute.
Note: Round your answer to decimal places.
Total cost for minute
b Determine which grinder speed minimizes the expected total cost for minute.Template for the MMs Queueing Model
Note: Round your answer to decimal places.
Total cost for minutes
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
