Question: New Exercise Bank Content Qu . 1 3 - 1 6 Jake's Machine Shop contains a grinder for sharpening the machine cutting tools. A decision

New Exercise Bank Content Qu.13-16
Jake's Machine Shop contains a grinder for sharpening the machine cutting tools. A decision must now be made on the speed at
which to set the grinder. The grinding time required by a machine operator to sharpen the cutting tool has an exponential distribution,
where the mean 1 can be set at 1 minute, or 1.5 minutes, or 2 minutes, depending upon the speed of the grinder. The running and
maintenance costs go up rapidly with the speed of the grinder, so the estimated cost per minute is $1.60 for providing a mean of 1
minute, and $0.90 for a mean of 1.5 minutes, and $0.40 for a mean of 2 minutes. The machine operators arrive randomly to sharpen
their tools at a mean rate of one every two minutes. The estimated cost of an operator being away from his or her machine to the
grinder is $0.80 per minute.
Click here for the Excel Data File
Obtain the various measures of performance for this queueing system for each of the three alternative speeds for the grinder. (Set t=5
minutes in the Excel template for the waiting-time probabilities.)
a-1. Determine the performance for this queueing system for 1 minute.
Note: Round your answers to 1 decimal place. Jake's Machine Shop contains a grinder for sharpening the machine cutting tools. A decision must now be made on the speed at
which to set the grinder. The grinding time required by a machine operator to sharpen the cutting tool has an exponential distribution,
where the mean 1 can be set at 1 minute, or 1.5 minutes, or 2 minutes, depending upon the speed of the grinder. The running and
maintenance costs go up rapidly with the speed of the grinder, so the estimated cost per minute is $1.60 for providing a mean of 1
minute, and $0.90 for a mean of 1.5 minutes, and $0.40 for a mean of 2 minutes. The machine operators arrive randomly to sharpen
their tools at a mean rate of one every two minutes. The estimated cost of an operator being away from his or her machine to the
grinder is $0.80 per minute.
b-1. Determine which grinder speed minimizes the expected total cost for 1 minute.
Note: Round your answer to 2 decimal places.
Total cost for 1 minute
b-2. Determine which grinder speed minimizes the expected total cost for 1.5 minute.Template for the M/M/s Queueing Model
Note: Round your answer to 2 decimal places.
Total cost for 1.5 minutes
 New Exercise Bank Content Qu.13-16 Jake's Machine Shop contains a grinder

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!