Question: Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as personal, seven percent; fatigue, six percent; delay, six

Nine observations from a work measurement study
Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as personal, seven percent; fatigue, six percent; delay, six percent. Use the Work Measurement Excel template to determine the standard time for this operation Work Observation Element1 2 9 Performance Rating A 0.11 0.16 0.10 0.09 0.12 0.11 0.17 0.16 0.17 105% B 0.24 0.20 0.23 0.22 0.27 0.24 0.27 0.27 0.27 90% 0.46 0.49 0.46 0.44 0.48 0.48 0.49 0.46 0.50 100% D 0.63 0.67 0.63 0.62 0.72 0.69 0.69 0.67 0.73 115% E 0.73 0.74 0.73 0.70 0.79 0.80 0.76 0.80 0.81 85% F 1.02 1.05 1.00 1.02 1.09 1.11 1.05 1.0 1.12 105% Round your answer to two decimal places minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!