Question: Not sure what I did wrong on this. A product engineer has developed the following equation for the cost of a system component: C =
Not sure what I did wrong on this.
A product engineer has developed the following equation for the cost of a system component: C = (10P)2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of 3identical components, all of which must operate for the system to operate. The engineer can spend $250 for the 3components. What is the largest component probability that can be achieved? (Do not round your intermediate calculations.Round yourfinal answer to 4 decimal places.)

A product engineer has developed the following equation for the cost of a system component: C=(10P)2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of 3 identical components, all of which must operate for the system to operate. The engineer can spend $250 for the 3 components. What is the largest component probability that can be achieved? (Do not round your intermediate calculations. Round your final answer to 4 decimal places.) Answer is complete but not entirely correct
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts