Question: NRL411-INTEGRATED WATER RESOURCES MANAGEMENT Assignment No. 2 Instruction(s): Submit a soft copy of your answer script via Moodle by Wednesday, 5th October, 2022. Your

NRL411-INTEGRATED WATER RESOURCES MANAGEMENT Assignment No. 2 Instruction(s): Submit a soft copy

NRL411-INTEGRATED WATER RESOURCES MANAGEMENT Assignment No. 2 Instruction(s): Submit a soft copy of your answer script via Moodle by Wednesday, 5th October, 2022. Your script should be typeset in Times New Roman, font size 12 with 1.5 line spacing A utility company intends to develop a mini-hydropower plant on the Mulungushi River. You have been consulted to perform a flow duration curve analysis of the streamflow data given in Table 1: presumably this analysis will also be used for future designs of water resources systems. Particularly, the company would like your recommendation regarding the maximum available power that can be generated per unit head with a 10% risk of failure of the water resources system and turbine efficiency of 85%. Submit a 5-page report of your results of analysis. The report should contain the introductory theoretical background, methodology, results (including tables and graphical illustrations), discussion, conclusion, and references[20 marks] Table 1: Streamflow data (m/s) for FDC Analysis Streamflow Data (m/sec) Month 1999 2000 2001 January 105 440 102 February 108 275 860 March 645 337 640 April 1000 515 690 May 1308 1968 1330 June 419 1965 930 July 89 360 155 August 28 F 71 92 September 32 50 50 October 40 95 88 November 80 100 305 December 210 88 300 END OF ASSIGNMENT

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!