Question: number 15 A-E (e) What is the probably after the shift? Pic plotted (f) Construct the OC curve for this control chart. (g) Construct the

number 15 A-E

 number 15 A-E (e) What is the probably after the shift?

(e) What is the probably after the shift? Pic plotted (f) Construct the OC curve for this control chart. (g) Construct the ARL curve for this control chart. 6-15 The length of industrial filters is a quality characteristic of interest. Thirty samples each of size 5, are chosen from the process. The data yield an average length of 110mm, with the process standard deviation estimated to be 4 mm. (a) Find the warning limits for a control chart for the average length. (b) Find the 30 control limits. What is the probability of a type I error? (c) If the process mean shifts to 112 mm, what are the chances of detecting this shift by the third sample drawn after the shift ? (d) What is the chance of detecting the shift for the first time on the second sample point drawn after the shift

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!