Question: O. inputs increase at the same rate as outputs 2 The critical path of a network is the: (2 Points) Longest time path through the

O. inputs increase at the same rate as outputs 2
O. inputs increase at the same rate as outputs 2 The critical path of a network is the: (2 Points) Longest time path through the network . Path with the fewest activities. O Path with the most activities shortest-time path through the network POF POF ch2.pdf CH3.pdf