Question: o test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, a chemical company
o test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, a chemical company obtained the following data on the time (in minutes) needed to mix the material.
| Manufacturer | ||
|---|---|---|
| 1 | 2 | 3 |
| 20 | 29 | 20 |
| 27 | 25 | 20 |
| 25 | 31 | 24 |
| 20 | 31 | 16 |
Use Fisher's LSD procedure to develop a 95% confidence interval estimate (in minutes) of the difference between the means for manufacturer 1 and manufacturer 2. (Round your answers to two decimal places.)
min to min