Question: Objective: operational efficieticy Optionsfor Consideration: Future Worth Method and Present Worvh Methid Option 1 : Build a New Two - Story Permanent Butlding, total 1
Objective:
operational efficieticy
Optionsfor Consideration: Future Worth Method and Present Worvh Methid
Option : Build a New TwoStory Permanent Butlding, total square foot, with Wood Frame and Stucco:
Cost per square foot: $
Life expectancy: vears
Annual operation cost: $
Option : Build a New TwoStory Modular Building, total square foot, on a Permanent Foundation:
Cost per square foot: $
Life expectancy: years
Annual operation cost: $
Option : Install New Portable Classrooms on a Wood Foundation:
Cost per building: $
Life expectancy: years
Annual operation cost first years: $
Annual operation cost after years: $
Option : Modernize Existing Wood and Auto Shops and Add a New Structure, total square foot:
Cost per square foot for modernization: $
Life expectancy: years
Annual operation cost: $
Task : Research
Conduct research providing background information, funding sources, construction timeline, and basis for pursuing the project for the abovementioned options.
Task II: Economic Analysis
erform an economic analysis of the options above using annual interest rate. Your calculations ould include:
Present Worth Method
Annual Worth Method
Future Worth Method
Capitalized Cost assume the life cycle can be repeated infinitely with the same cash flow pattern
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock