Question: Oldham Corporation bases its predetermined overhead rate on variable manufacturing overhead cost of $4.00 per machine-hour and fixed manufacturing overhead cost of $87,822 per period.
Oldham Corporation bases its predetermined overhead rate on variable manufacturing overhead cost of $4.00 per machine-hour and fixed manufacturing overhead cost of $87,822 per period. If the denominator level of activity is 4,100 machine-hours, the fixed component in the predetermined overhead rate would be:
A.) $25.42
B.) $4.00
C.) $21.42
D.) $400.00