Question: On a 1 0 0 0 - MVA common base, a two - area system interconnected by a tie line has the following parameters: Area

On a 1000-MVA common base, a two-area system interconnected by a tie line has the following parameters: Area 1: R =0.05 per unit, D =0.6 per unit Area 2: R =0.0625 per unit, D =0.9 per unit The two areas are operating in parallel at the nominal frequency of 60 Hz. The areas are initially operating in steady state with each area supplying 1000 MW when a sudden load increase of 187.5 MW occurs in area 1. Assume that the increment load is not sensitive to frequency. Compute the new steady-state frequency and change in tie-line power flow for the following two cases. ) LFC is employed.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!