Silverstone's production budget for July called for making 38,000 units of a single product. The firm's...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Silverstone's production budget for July called for making 38,000 units of a single product. The firm's production standards allow one-half of a machine hour per unit produced. The fixed overhead budget for July was $33,060. Silverstone uses an absorption costing system. Actual activity and costs for July were: Units produced Fixed overhead costs incurred Required: a. Calculate the predetermined fixed overhead application rate per machine hour that would be used in July. (Round your answer to 2 decimal places.) Predetermined overhead application rate per machine hour 34.610 $ 37,200 b. Calculate the number of machine hours that would be allowed for actual July production. Machine hours allowed c. Calculate the fixed overhead applied to work in process during July. (Do not round intermediate calculations.) Applied overhead d. Calculate the over- or underapplied fixed overhead for July. (Do not round intermediate calculations.) fixed overhead Calculate the fixed overhead budget and volume variances for July. (Do not round intermediate calculations. Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (1.e., zero varlance).) Fixed overhead budget variance Fixed overhead volume variances Silverstone's production budget for July called for making 38,000 units of a single product. The firm's production standards allow one-half of a machine hour per unit produced. The fixed overhead budget for July was $33,060. Silverstone uses an absorption costing system. Actual activity and costs for July were: Units produced Fixed overhead costs incurred Required: a. Calculate the predetermined fixed overhead application rate per machine hour that would be used in July. (Round your answer to 2 decimal places.) Predetermined overhead application rate per machine hour 34.610 $ 37,200 b. Calculate the number of machine hours that would be allowed for actual July production. Machine hours allowed c. Calculate the fixed overhead applied to work in process during July. (Do not round intermediate calculations.) Applied overhead d. Calculate the over- or underapplied fixed overhead for July. (Do not round intermediate calculations.) fixed overhead Calculate the fixed overhead budget and volume variances for July. (Do not round intermediate calculations. Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (1.e., zero varlance).) Fixed overhead budget variance Fixed overhead volume variances
Expert Answer:
Answer rating: 100% (QA)
Budgeted Machine Hr 380005019000 Predetermined Overhead Application RateEs... View the full answer
Related Book For
Fundamentals of Physics
ISBN: 978-0471758013
8th Extended edition
Authors: Jearl Walker, Halliday Resnick
Posted Date:
Students also viewed these accounting questions
-
A block with mass m = 2.00 kg is placed against a spring on a frictionless incline with angle = 30.0o (Figure b) (The block is not attached to the spring.) The spring, with spring constant k = 19.6...
-
A ball initially slides without rotating on a horizontal surface with friction (see Fig). The initial speed of the ball is V0, and the moment of inertia about its center is I = ?mR2.(a) Without...
-
A 12-kg crate rests on a horizontal surface and a boy pulls on it with a force that is 30? belowthe horizontal. If the coefficient of static friction is 0.40, the minimum magnitude force he needs to...
-
The United StatesMexicoCanada Agreement replaced what trade agreement?
-
If a rent ceiling is set at $300 a month, what is the quantity of housing rented, the shortage of housing, and the maximum price that someone is willing to pay for the last unit of housing available?...
-
Many people know the mathematical constant p is approximately 3.14. But that's not exact. To be more precise, here are 20 decimal places: 3.14159265358979323846. Still not exact, though. In fact, the...
-
How much work will a heat engine do if it takes in \(80 \mathrm{~J}\) of heat energy from a hightemperature source and expels \(25 \mathrm{~J}\) of waste heat into its surroundings? (a) \(60...
-
The management of Sprague Inc. was discussing whether certain equipment should be written off as a charge to current operations because of obsolescence. This equipment has a cost of $900,000 with...
-
Daryl age 40 is leaving his company and has been offered to two options. First, is to take a deferred pension at age 65 equal to 25,000 a year. Second, take the commuted value of the deferred...
-
Ohio Swiss Milk Products manufactures and distributes Ice cream in Ohio, Kentucky and West Virginia. The company wants to expand operations by locating another plant in northern Ohio. The size of the...
-
5. (15%) Give an analysis for each of the following pseudo-code segments. You should evaluate the exact number of multiplications first and then determine the computational complexity in terms of the...
-
System designers and system builders also tend to have very different views of system building blocks. Explain the different ways that designers and builders might view the communication building...
-
As business technology becomes more powerful and sophisticated, many businesses are redesigning their single-function information systems, such as sales, into cross-functional information systems...
-
Interview at least one person in marketing, customer service, and accounting/payroll in the same company: What types of information do they handle? Do they share information across departments? Do...
-
It is common for system owners and system users to have very different views of the same business processes used in an information system. Why do you think this is? Consider an airline that is...
-
Alaskan Fisheries, Inc., processes salmon for various distributors and it uses the weighted-average method in its process costing system. The company has two processing departmentsCleaning and...
-
Compute the employer's payroll tax expense based on the following totals found on a completed payroll register dated November 15. bullet Gross pay = $ 41 comma 000.00 bullet Taxable earnings for...
-
Find the numerical value of each expression. (a) sech 0 (b) cosh -1 1
-
The linear density of a string is l6 x 10-4 kg/m. A transverse wave on the string is described by the equation y = (0.021 m) sin [(2.0m-1)x + (30 s-1)t]. What are? (a) The wave speed and (b) The...
-
In Figure an ideal battery of emf = 12.0 V is connected to a network of resistances R1 = 6.00??, R2 = 12.0??, R3 = 4.00??, R4 = 3.00?? and R5 = 5.00??. What is the potential difference across...
-
In Figure a stick of length L = 1.85m oscillates as a physical pendulum.(a) What value of distance x between the stick's center of mass and its pivot point O gives the least period?(b) What is that...
-
You are the senior partner of a large, local audit firm. In reviewing the work of a junior staff member on a compilation engagement for Greasemonkey's Delight Inc., a local autoparts store (in which...
-
The chapter discussed three issues to consider when obtaining evidence using a sample-based audit procedure: a. The number of transactions or items to examine b. The actual transactions or items to...
-
Compare and contrast statistical and non-statistical (judgmental) sampling. Include in your discussion conditions that might make one approach to sampling more desirable than the other.
Study smarter with the SolutionInn App