Question: On average, the demand at a donut store is 1 2 0 donuts per day. The store has one machine, and the machine setup time

On average, the demand at a donut store is 120 donuts per day. The store has one machine, and the machine setup time is 10 minutes. After each setup, the machine can produce a batch of donuts, and each donut takes 2 minutes to produce. Assume the same batch size all the time, and the store is open 8 hours a day.
What is the minimum batch size to satisfy the demand?