Question: One of the methods for estimating the risk likelihood (probability of failure) of a system development is to compare the current design status with comparable

One of the methods for estimating the risk likelihood (probability of failure) of a system development is to compare the current design status with comparable situations in existing systems. Table 5.2 shows some basic characteristics that are useful in making these estimates. For each of the first three conditions associated with high - risk projects, briefly describe an example of such a condition in a real system, or describe a hypothetical example having such characteristics.

- Self Check Out Machine or Smart Home System

Table 5.2