Question: only i need the fourmultion Question 1 ( 3 pts) Three identical drilling machines are supposed to process 10 metal sheets. The drilling times of
only i need the fourmultion
Question 1 ( 3 pts) Three identical drilling machines are supposed to process 10 metal sheets. The drilling times of the sheets are given in the following table. Each sheet must be procecced by only one machine. Each machine can process at most one sheet at a given instant. The preomption of the jobs is not allowed (when we start drilling a sheet we should finish it without preomption on the same machine). How to assign the sheets on the machines in order to minimize the makespan. (The makesapn is the completion time of the last drilled sheet). P (i) is the drilling time in munites of sheet ii=1,,10. Formulate the problem as an integer linear program: A. Define the parametres. B. Give the decision varaibles C. Give the objective function. D. Design the constraints
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock