Question: ONLY NEED ONE PART- PLEASE HELP Each bank teller workstation is forecasted to process 210 transactions (the end item) on Friday. The bank is open
ONLY NEED ONE PART- PLEASE HELP
Each bank teller workstation is forecasted to process 210 transactions (the end item) on Friday. The bank is open from 9:00 a.m. to 7:00 p.m. on Friday, with 90 minutes for lunch and breaks. Two teller windows are open on Friday. A work-study analysis reveals that the breakdown of the transaction mix is 50 percent deposits, 40 percent withdrawals, and 10 percent transfers between accounts. A different form is used for each type of transaction, so there is one deposit slip per deposit, one withdrawal slip per withdrawal, and two transfer slips per transfer. Round your answers to the nearest whole number.
C. Deposit slips are delivered every second day. If the on-hand balance of deposit slips is 30 at this bank, how many deposit slips should be ordered?

Each bank teller workstation is forecasted to process 210 transactions (the end item] on Friday. The bank is open from 9:00 am. to ?:DD p.m. on Friday, with 90 minutes for lunch and breaks. Two teller windows are open on Friday. A work-study analysis reveals that the breakdown of the transaction mix is 50 percent deposits, 40 percent VirithdiawalsJ and 10 percent transfers between accounts. A different form is used for each type of transactionr so there is one deposit slip per deposit, one withdrawal slip per withdrawal, and two transfer slips per transfer. Round your answers to the nearest wh ole number. a. How many transfer slips are needed on Friday? 34 Q9 b. How many withdrawal slips are needed on Friday? 168 w c. Deposit slips are delivered every second day. Ifthe onhand balance of deposit slips is 30 at this bank, how many deposit slips should be ordered? 225 0
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
