Question: OPER 3 1 4 Spring 2 0 2 4 ( c ) points ) How long would it take to produce 1 0 0 units,
OPER
Spring
c points How long would it take to produce units, starting with an empty syst
The firm is hiring a fifth worker. Assume that tasks are allocated to the five workers to be done in their numerical order.
d points What is the capacity of this line now?
Again, assume the firm has hired a fifth worker. Assume further that tasks are alloc of the line and that tasks can be performed in any capacity that
e points What is the maximum capacity tha
f points What is the minimum number of workers that could prod Assume the tasks can be allocated to workers as described in the begin any order