Question: operating time : 90 min desired time : 60 min Since picture is not clear: A 1.5 B 0.5 C 0.5 D 0.8 E 1

operating time : 90 min
desired time : 60 min operating time : 90 min desired time : 60 min
Since picture is not clear:
A 1.5
B 0.5
C 0.5
D 0.8
E 1
F 1
G 0.5
Tak Time Minutes A 15 2 Balance the following assembly line. Primary Heuristic assien sub-station with largest positional power / The Breaker Heuristic Assign sub-station with longest time Desired Outpu: 90 units per hour Operating Time: 60 units per hour B D E lalalalalal a) What is the Cycle Time ? b) What is the minimum number of workstations ? c) Which sub-stations will be grouped together in each station? d) What is the line efficiency? Revised Time Assign Time Workstation Remaining Eligible Task Remaining Station Idle Time DISPLAY CALCULATIONS HERE

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!