Question: **OPERATIONS RESEARCH METHODS** A consultant has been hired to study the productivity of the warehouse. Upon surveying and data collection from the site, a linear

**OPERATIONS RESEARCH METHODS**

**OPERATIONS RESEARCH METHODS** A consultant has

A consultant has been hired to study the productivity of the warehouse. Upon surveying and data collection from the site, a linear program is proposed as shown below: Maximise x+y o 2x+ y> 3 x - 2y 5-1 y 0 (a) Solve the linear program graphically. Find the optimum point and the maximum objective value. (6) Using the result from part a), find the dual price of the constraint inequality 0. Using the result from part a), find the range of feasibility of the constraint inequality 0

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!