Question: optimization advance math optimization network model Math + Optimization Consider the following project with time measured in days and costs in thousand dollars. The minimum

optimization
optimization advance math optimization network model Math + Optimization Consider the following
advance math optimization network model

Math + Optimization Consider the following project with time measured in days and costs in thousand dollars. The minimum time can be achieved at maximum cost by obtaining additional resources. Normal Minimum Normal Maximum Activity Predecessors Time Time Cost Cost A None 14 12 15 17.5 B 14 11 55 64 B 8 5 50 75 NONE 12 9 40 50 BD 18 16 50 65 CE 20 16 40 55 E 14 10 55 70 FG 21 19 25 65 10 8 25 32 20 10 50 120 9 6 25 40 15 10 10 40 Imo> I-3 a) using the normal times, formulate a linear program to determine a start time for each activity that would minimize the project's total duration. Constrain all start times to be unrestricted in sign except for the dummy START activity which should have a nonnegative start time. Solve the created model using excel solver b) Create the Activity-On-Nodes Network for this project. c) Using exhaustive enumeration and normal times determine all critical paths for this project. Math + Optimization Consider the following project with time measured in days and costs in thousand dollars. The minimum time can be achieved at maximum cost by obtaining additional resources. Normal Minimum Normal Maximum Activity Predecessors Time Time Cost Cost A None 14 12 15 17.5 B 14 11 55 64 B 8 5 50 75 NONE 12 9 40 50 BD 18 16 50 65 CE 20 16 40 55 E 14 10 55 70 FG 21 19 25 65 10 8 25 32 20 10 50 120 9 6 25 40 15 10 10 40 Imo> I-3 a) using the normal times, formulate a linear program to determine a start time for each activity that would minimize the project's total duration. Constrain all start times to be unrestricted in sign except for the dummy START activity which should have a nonnegative start time. Solve the created model using excel solver b) Create the Activity-On-Nodes Network for this project. c) Using exhaustive enumeration and normal times determine all critical paths for this project

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!