Question: Optimization Group Project Instructions Instructions This is a group assignment. In order to complete the assignment, first read the Hawley Lighting Company case study. Conduct

Optimization Group Project Instructions
Instructions
This is a group assignment. In order to complete the assignment, first read the Hawley Lighting
Company case study. Conduct necessary calculations and answer the questions listed below. Submit
your Excel spreadsheet(s) with calculations to the assignment dropbox before the posted deadline.
Prepare a properly formatted Management Report, which includes your answers to the assignment
questions. Include cover page and appropriate references.
Grading
A total of 20 points is possible for this assignment. This includes the point values which are assigned to
each question (point values are noted next to each question below). This includes the point values
which are assigned to each question (point values are noted next to each question below) plus 2 points
which are earned based on following the prescribed assignment format, and the proper writing style
including APA format.
For full credit for Parts A and B, you must turn in your spreadsheet with dynamically coded formulas (not
hard-coded numbers).
1. Spreadsheet Model (in Excel)
Part A (3 points). Read the case study Hawley Lighting Company. Download Hawley Data Fall23.xlsx
file and complete the model:
Calculate Unit Profit for each product (in cells B8:I8) and Total Profit (in cell B19)
Calculate total capacity required in Department 1(overtime) in cell B24 and Department 2
(regular and overtime) in cells B25:B26
Calculate total units produced of each product family in cells B28:B31.
Estimate the optimal production plan and run the sensitivity analysis.
Part B (2 points). A third-party company approached Hawleys management offering to assemble and
produce pendant lights for $27 per unit. Modify the production plan model in Part A to include the
pendant light outsourcing. Assume the advertising budget with $18,000 limit. Estimate new optimal
production plan and run the sensitivity analysis.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Optimization Group Project Instructions Summary for Question ID 25447839 Overview This group project ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!