Optimize the Lean Sandwich Shop's process by eliminating waste. Please use the information collected in the...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Optimize the Lean Sandwich Shop's process by eliminating waste. Please use the information collected in the previous modules, including the Work Combination Chart, Work Balance Table, Capacity Analysis, and Value Stream Map, to help identify the waste. There are also several strategies shared in Module 7 that can be used to improve the process. Your new design can be drawn by hand or created digitally using PowerPoint, Visio, or another drawing application. Key questions to consider in your design: Can any of the processes be improved? If so, how will that change the labor required? How many people are optimal for the process? Can we maximize the utilization of our employees by combining any of the processes, such as through the creation of a Work Cell? Do we need to make any capital investments for additional machines? If so, how will we justify the costs? What is the most efficient floor layout for the new process? To earn a passing grade for this case, the new design must be able to meet customer demand and show a reduction in costs. For this submission, it is recommended to include the following: Floor layout that shows the location of the stations or worktables, employees, and equipment Number of employees performing each task Task cycle times TIP: Create and submit a new Work Balance Table to help explain your new process design. Part Number: Part Name: Process: Time Standard: Seconds Date: Takt Time: Time Intervals 5 Prepared by: Work Elements Start End 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 18 10 154 Toast Sandwich Place in toaster & setup Unload the toaster 19 155 165 Date: Prepared by: Process Time Takt Time # of Employees 600.00 10.00 60.00 100 90 90 80 70 Time in Seconds 0 60 60 50 40 40 30 20 10 ... 0 Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 1 Task 2 Task 3 Employees 3 1 Task 4 2 Task Cycle Time 120.00 15.00 Process Cycle Tim 40.00 15.00 90.00 120.00 90.00 60.00 Task 5 Task 6 3 1 165.00 60.00 55.00 60.00 Task 7 30.00 30.00 Task 1 Task 2 Task 3 Task 4 Task 5 Process Cycle Task 6 Time Task 7 Lean Sandwich Shop is open 10 hours per day, seven days a week, 364 days per year. Below is a process map outlining how they make a sandwich: Customer Places Order Task #1 Record and Deliver Order Task #2 Receive Order and Select Bread Task #3 Add Protein to the Sandwich Task #4 Add Vegetables and Toppings Task #5 Place Sandwich in Toaster Task #6 Wrap the Sandwich Task #7 120 secs 15 secs 90 secs 120 secs 165 secs 60 secs Deliver the Sandwich to Customer 30 secs Lean Sandwich Shop is currently staffing each process with the following number of employees consistently through the 10-hour shift: 3 Employees Task #1 1 Employee Task #2 1 Employees Task #3 2 Employees Task #4 3 Employees Task #5 1 Employee Task #6 1 Employee Task #7 Lean Sandwich Shop averages the following orders: Sandwiches per day: 600 Updated hourly volume: 11 a.m. 9% 12 p.m. 22% 1 p.m. 10% 2 p.m. 5% 3 p.m. 5% 4 p.m. 7% 5 p.m. 15% 6 p.m. 15% 7 p.m. 7% 8 p.m. 5% Design a new Work Cell using the information collected in the Work Combination Chart, Work Balance Table, Capacity Analysis, and Value Stream Map created in Module 4. What method of Work Cell did you use? The old process had a TPH of 5; what is the new TPH? How many employees will you need during the 12 p.m. hour? Optimize the Lean Sandwich Shop's process by eliminating waste. Please use the information collected in the previous modules, including the Work Combination Chart, Work Balance Table, Capacity Analysis, and Value Stream Map, to help identify the waste. There are also several strategies shared in Module 7 that can be used to improve the process. Your new design can be drawn by hand or created digitally using PowerPoint, Visio, or another drawing application. Key questions to consider in your design: Can any of the processes be improved? If so, how will that change the labor required? How many people are optimal for the process? Can we maximize the utilization of our employees by combining any of the processes, such as through the creation of a Work Cell? Do we need to make any capital investments for additional machines? If so, how will we justify the costs? What is the most efficient floor layout for the new process? To earn a passing grade for this case, the new design must be able to meet customer demand and show a reduction in costs. For this submission, it is recommended to include the following: Floor layout that shows the location of the stations or worktables, employees, and equipment Number of employees performing each task Task cycle times TIP: Create and submit a new Work Balance Table to help explain your new process design. Part Number: Part Name: Process: Time Standard: Seconds Date: Takt Time: Time Intervals 5 Prepared by: Work Elements Start End 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 18 10 154 Toast Sandwich Place in toaster & setup Unload the toaster 19 155 165 Date: Prepared by: Process Time Takt Time # of Employees 600.00 10.00 60.00 100 90 90 80 70 Time in Seconds 0 60 60 50 40 40 30 20 10 ... 0 Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 1 Task 2 Task 3 Employees 3 1 Task 4 2 Task Cycle Time 120.00 15.00 Process Cycle Tim 40.00 15.00 90.00 120.00 90.00 60.00 Task 5 Task 6 3 1 165.00 60.00 55.00 60.00 Task 7 30.00 30.00 Task 1 Task 2 Task 3 Task 4 Task 5 Process Cycle Task 6 Time Task 7 Lean Sandwich Shop is open 10 hours per day, seven days a week, 364 days per year. Below is a process map outlining how they make a sandwich: Customer Places Order Task #1 Record and Deliver Order Task #2 Receive Order and Select Bread Task #3 Add Protein to the Sandwich Task #4 Add Vegetables and Toppings Task #5 Place Sandwich in Toaster Task #6 Wrap the Sandwich Task #7 120 secs 15 secs 90 secs 120 secs 165 secs 60 secs Deliver the Sandwich to Customer 30 secs Lean Sandwich Shop is currently staffing each process with the following number of employees consistently through the 10-hour shift: 3 Employees Task #1 1 Employee Task #2 1 Employees Task #3 2 Employees Task #4 3 Employees Task #5 1 Employee Task #6 1 Employee Task #7 Lean Sandwich Shop averages the following orders: Sandwiches per day: 600 Updated hourly volume: 11 a.m. 9% 12 p.m. 22% 1 p.m. 10% 2 p.m. 5% 3 p.m. 5% 4 p.m. 7% 5 p.m. 15% 6 p.m. 15% 7 p.m. 7% 8 p.m. 5% Design a new Work Cell using the information collected in the Work Combination Chart, Work Balance Table, Capacity Analysis, and Value Stream Map created in Module 4. What method of Work Cell did you use? The old process had a TPH of 5; what is the new TPH? How many employees will you need during the 12 p.m. hour?
Expert Answer:
Posted Date:
Students also viewed these general management questions
-
A company is considering purchasing either Machine I or Machine II. The following data apply: O $21,500 O $26,575 $27,080 Parameter The annual interest rate is 10%, and all cash flows may be treated...
-
Refer to the balance sheets of Plate and Salad in the previous problem. Assume that Plate buys 80% of Salads common stock for $180,000 cash. The fair value of Salads land is $20,000, the fair value...
-
The following transactions occur for Badger Biking Company during the month of June: a. Provide services to customers on account for $40,000. b. Receive cash of $32,000 from customers in (a) above....
-
Define contribution margin. Is it best expressed as a total amount or as a per-unit amount? In what way is the term descriptive of the concept it represents?
-
Cable Corporation, which operates a fleet of motorized trolley cars in a resort city, is undergoing a complete liquidation. John, who owns 80% of the Cable stock, plans to continue the business in...
-
You are conducting a multinomial hypothesis test for the claim that the 4 categories occur with the following frequencies:Ho : pA=0.1; pB=0.5; pC=0.3; pD=0.1 a) Complete the table. Round all values...
-
Corolla Corp, began business in 2021. Prepare the general journal entries for Corolla Corp: a. On 6/2/2021 purchased 300,000 shares of stock in PSG for $15 per share. Classified as Trading. b. On...
-
An electric field does 2.61 x 10 3 eV of work on an oxygen nucleus of charge 1.28 x 10 -18 C. Find the change in the nucleus' electric potential and electric potential energy in joules.
-
Consider the given signal x[n]. - x[n] = nu[n + 2] + (3 n)u[n 4] - 3u[n - 8] a. Sketch the signal. b. Sketch the signal x[4-n]. Explain briefly each of the steps of your plot. c. Sketch the signal...
-
A is an administrative arrangement used by financial institutions that quarantines information within one part of the institution and prevents information possessed by persons in one part of the...
-
1. A distillation column is separating methane, ethane, propane, and butane. We pick methane and propane as the keys. This means that ethane is a distributed non-key or "sandwich" component. a. Show...
-
A parallel plate capacitor, when filled with a dielectric material (x = 3.7) between its plates, has a capacitance of 3.05 pF. The capacitor is initially charged to a certain potential difference AV,...
-
A thin plate of a binary alloy of composition N A = 0.245 and N B = 0.755 was welded to a similar plate of composition N A = 0.255 and N B = 0.745 so as to form a diffusion couple. After a diffusion...
-
Determine the reactions in supports A and D and connections B and C. Sketch its shear and moment diagram and determine the magnitude ankoration of the maximum shear and moment for every member. 18 3...
Study smarter with the SolutionInn App