Question: Orange Test Laboratories does heat testing (HT) and stress testing (ST) on materials and operates at capacity. Under its current simple costing system, Orange aggregates


Orange Test Laboratories does heat testing (HT) and stress testing (ST) on materials and operates at capacity. Under its current simple costing system, Orange aggregates all operating costs of $1,300,000 into a single overhead cost pool. Orange calculates a rate per test-hour of $13 ($1,300,000100,000 total test-hours). HT uses 60,000 test-hours, and ST uses 40,000 test-hours. Gary O'Loughlin, Orange's controller, believes that there is enough variation in test procedures and cost structures to establish separate costing and billing rates for HT and ST. The market for test services is becoming competitive. Without this information, any miscosting and mispricing of its services could cause Orange to lose business. O'Loughlin divides Orange's costs into four activity-cost categories. (Click the icon to view the activity-cost categories.) Read the requirements. Calculate the cost of each activity and the total cost of the heat testing and stress testing. a. Direct-labor costs, $243,000. These costs can be directly traced to HT, $183,000, and ST, $60,000. b. Equipment-related costs (rent, maintenance, energy, and so on), $400,000. These costs are allocated to HT and ST on the basis of test-hours. c. Setup costs, $385,000. These costs are allocated to HT and ST on the basis of the number of setup-hours required. HT requires 13,500 setup-hours, and ST requires 4,000 setup-hours. d. Costs of designing tests, $252,000. These costs are allocated to HT and ST on the basis of the time required for designing the tests. HT requires 2,800 hours, and ST requires 1,400 hours
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts