Question: Orlando's assembly unit has decided to use a p - Chart with 3 - sigma control limits to monitor the proportion of defective copper wires
Orlando's assembly unit has decided to use a pChart with sigma control limits to monitor the proportion of defective copper wires produced by their production process. The operations manager randomly samples copper wires at
successively selected time periods and counts the number of defective copper wires in the sample.
Table
Control Chart
Step of :
At the next time period,
copper wires are sampled and defective copper wires are detected.