Question: OUDEM www.fr An analyst developed a simulation model using Risk Solver Platform to estimate the time to complete the development of a new information system.

OUDEM www.fr An analyst developed a simulation
OUDEM www.fr An analyst developed a simulation
OUDEM www.fr An analyst developed a simulation
OUDEM www.fr An analyst developed a simulation
OUDEM www.fr An analyst developed a simulation model using Risk Solver Platform to estimate the time to complete the development of a new information system. The model specifies a probability distribution for each task in the project plan, and then calculates the completion time. Data on the output measure Time to Complete in days is shown below. If the analyst wants to quote a 90% confidence interval for "Time to Complete": what number should be use as the upper limit? Name Project Ends Description Output Minimum Maximum Man Su Devation Variance Skewness Kurtosis Errors Mode 5% Pere 10% Perc 15% Perc 20% Perc 25% Perc 3096 Perc 35% Perd 400Perc 45% Perc 50% Perc 5546 Perc 60% Perc 65% Pere 70% Perc 75% Pere 50% Perc 85% Perc Perc 95% Perc 180,2 356.7 247.4 31.2 971.8 0.4 2.7 0.0 237,8 2010 208.1 213.7 218.6 323,5 227.9 232.2 236.6 240,8 245.1 249.4 253.9 258.4 262.2 258.6 274.4 281.1 289.8 302.8 An analyst developed a simulation model using Risk Solver Platform to estimate the time to complete the development of a new information system. The model specifies a probability distribution for each task in the project plan and then calculates the completion time. Data on the output measure Time to Complete linda is shown below. What is the expected time to complete this project? Name Description Project Ends Output Minimum Maximum Mean Std Deviation Nariance Skewness Kurtosis Errors Mode 5% Perc 10% Perc 15% Perc 2096 Perc 25% Perc 30% Perc 35% Pere 40% Perc 45% Pere 50% Perd 55% Perc 60% Perc 65% Perc 70% Perc 75% Perc 80% Perc 85% Perc 90% Perc 95% Perc 180.2 356.7 247.4 31.2 971.8 0.4 2.7 0.0 237.8 201.0 208.1 213.7 218.6 223.5 227.9 232.2 236.6 240.8 245.1 249.4 253.9 258.4 263.2 268.6 274.4 281.1 289.8 302.8 If the analyst wants to quote a 90% confidence interval for "Time to Complete", what number should he use as the upper limit? What is the expected time to complete this project

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!