Question: our project includes the installation, termination and testing of local area network cable. you have scheduling to install 1 , 0 0 0 lan drops

our project includes the installation, termination and testing of local area network cable. you have scheduling to install 1,000 lan drops in a period of 4 weeks. The installations are scheduled on a prorated basis. The cost of the entire installation is budgeted at 100,000
at the end of 2 weeks you have installed 550 lan drops at an actual cost of 95.00 per lan drop. you have also determined that the cause of your variance is seen as typical
for each of the following measurments provide the answer (value)
pv, ev, ac, bac, cv, cpi, sv, spi, eac, etc, vac