Question: P4-9. Determining Total Job Costs, Using Predetermined Overhead Rate LO6 Channel Products Inc. uses the job order cost system of accounting. The following is a

 P4-9. Determining Total Job Costs, Using Predetermined Overhead Rate LO6 Channel

Products Inc. uses the job order cost system of accounting. The following

P4-9. Determining Total Job Costs, Using Predetermined Overhead Rate LO6 Channel Products Inc. uses the job order cost system of accounting. The following is a list of the jobs completed during March, showing the charges for materials issued to production and for direct labor. Materials Issued $ 300.00 Direct Labor Job 18AX. $ 600.00 19BT 940.00 1,080.00 720.00 20CD 1,400.00 5,120.00 21FB 4,200.00 Assume that factory overhead is applied on the basis of direct labor costs and that the predetermined rate is 200%. REQUIRED: 1. Compute the amount of overhead to be added to the cost of each job completed during the month. 2. Compute the total cost of each job completed during the month. 3. Compute the total cost of producing all the jobs finished during the month. Problem 4-9 Direct Materials Cost Direct Labor Cost 1. Applied Factory Overhead 2. and 3. Total Production Cost Job 18AX 19BT 20CD 21FB Total

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!