Question: PA 9-7 For 120 consecutive days, a process engineer... For 138 consecutive days, a process engineer has measured the temperature of champagne bottles as they
PA 9-7 For 120 consecutive days, a process engineer...
| For 138 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 9 bottles. The average across all 1242 bottles (138 days, 9 bottles per day) was 51 degrees Fahrenheit. The standard deviation across all bottles was 1.4 degrees. | ||
| (Round your intermediate calculations and final answer to 4 decimal places.) | ||
| When constructing an X-bar chart, what would be the upper control limit? | ||