Question: Part 1 . Crest Vertical Curve ( 4 pts ) G 1 = + 2 % G 2 = - 5 % VPI Station =

Part 1. Crest Vertical Curve (4 pts)
G1=+2%
G2=-5%
VPI Station =200+00
VPI Elevation =900.00-ft
Design Speed =40mph
a) Determine the minimum length of curve (1 pt )
b) Determine the equation that provides the elevation at any point along the curve as a function of its distance from the VPC (1 pt)
c) Determine the station of the high point. (1 pt)
d) Determine the elevation of the high point (1 pt)