Question: Part 1 : Design the Local Area Network The work milestones for this part of the project are as follows: The LAN must consist of

Part 1: Design the Local Area Network
The work milestones for this part of the project are as follows:
The LAN must consist of 2 switches and 3 computers.
The two switches must be named S1 and S2.
The three computers must be named PC-A, PC-B, and PC-C.
Part 2: Create the basic switch configurations
Your network engineering lead has approved the LAN design. Now, the work to implement the
design can begin. Your tasks are as follows:
2.1 Cable the network
Connect PC-A to S1 on Ethernet Interface 6
Connect S1 to S2 on Ethernet Interfaces 1
Connect PC-B to S2 on Ethernet Interface 11
Connect PC-C to S2 on Ethernet Interface 18
2.2. Configure the basic switch functions
Configure the basic functions in both S1 and S2 as follows:
Set the enable secret to class
Set the line con 0 password to cisco
Set the line vty 015 password to cisco
Set the MOTD to Unauthorized access is strictly prohibited.
Set logging to synchronous

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Programming Questions!