Question: Part 1 : Design the Local Area Network The work milestones for this part of the project are as follows: The LAN must consist of
Part : Design the Local Area Network
The work milestones for this part of the project are as follows:
The LAN must consist of switches and computers.
The two switches must be named S and S
The three computers must be named PCA PCB and PCC
Part : Create the basic switch configurations
Your network engineering lead has approved the LAN design. Now, the work to implement the
design can begin. Your tasks are as follows:
Cable the network
Connect PCA to S on Ethernet Interface
Connect S to S on Ethernet Interfaces
Connect PCB to S on Ethernet Interface
Connect PCC to S on Ethernet Interface
Configure the basic switch functions
Configure the basic functions in both S and S as follows:
Set the enable secret to class
Set the line con password to cisco
Set the line vty password to cisco
Set the MOTD to Unauthorized access is strictly prohibited.
Set logging to synchronous
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
