Question: part 1) Part 2) Using the same information as above, what is the optimal number of machines to put at station 1 to keep total
part 1)

Part 2) Using the same information as above, what is the optimal number of machines to put at station 1 to keep total cycle time under 2.5 hours? Assume the arrival coefficient of variation to station 1 is 1.
Consider the following 5 station system, which has a higher arrival rate to station 5 due to necessary re-work at that station. What is the minimum cost, capacity feasible number of machines to install at Station 4