Question: Part 1 With reference to the attached drawing no . CON 4 1 1 0 / MD / 0 0 1 A , prepare a

Part 1
With reference to the attached drawing no. CON4110/MD/001A, prepare a takingoff list and take off all quantities for the sub-structure works in accordance with HKSMM4/4R. All calculations should be completed in a dimension paper format. Relevant cross-reference of the HKSMM4/4R shall be quoted in the answers.
- All surplus excavated materials shall be removed from the Site to a specified dumping area provided by the Employer;
- Quality of formwork: Sawn formwork;
- R.C. footings, walls and beds: Reinforced concrete grade 30D/20;
- Blinding layer. Plain concrete grade 100/20;
- Hardcore bed. Concrete rubbles and surfaces to be blinded with coarse sand;
- One layer of 1.2 mm thick polythene sheet is to be laid between concrete bed and hardcore bed.
Part 1 With reference to the attached drawing no

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!