Question: Part 1 With reference to the attached drawing no . CON 4 1 1 0 / MD / 0 0 1 A , prepare a
Part
With reference to the attached drawing no CONMDA prepare a takingoff list and take off all quantities for the substructure works in accordance with HKSMMR All calculations should be completed in a dimension paper format. Relevant crossreference of the HKSMMR shall be quoted in the answers.
All surplus excavated materials shall be removed from the Site to a specified dumping area provided by the Employer;
Quality of formwork: Sawn formwork;
RC footings, walls and beds: Reinforced concrete grade D;
Blinding layer. Plain concrete grade ;
Hardcore bed. Concrete rubbles and surfaces to be blinded with coarse sand;
One layer of mm thick polythene sheet is to be laid between concrete bed and hardcore bed.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
