Question: Part 2 ( 2 0 points ) SmarTouch produces two product models: SmarTouch XL and SmarTouch PRO. The processes for manufacturing these products are identical
Part points
SmarTouch produces two product models: SmarTouch XL and SmarTouch PRO. The processes for manufacturing these products are identical ie one value stream SmarTouch receives total orders for products per year from external customers. Annual demand for the SmarTouch XL is units. The Final Assembly Department receives parts from the Main Assembly Department. Final Assembly utilizes three processes: manual assembly, labeling, and packaging.
Create a current state value stream map for the process flow described below. Include the inventory lead times and the process cycle times for all processes using units of minutes. points
Indicate the a overall takt time in minutes, b total process time in minutes, and c total production lead time in minutes for this value stream neglect changeover points
Information about the three processes in the Final Assembly Department is detailed below.
Manual Assembly Process:
There is an observed workinprocess WIP inventory of SmarTouch XL and SmarTouch PRO products before manual assembly.
The manual assembly workstation requires nine operators and is dedicated to final assembly of both models.
Manual assembly cycle time is minutes with a changeover time of minutes between the SmarTouch XL and SmarTouch PRO, and an overall reliability of for SmarTouch XL and for SmarTouch PRO ie and of products do not pass inspection, respectively, and must be sent for rework
Labeling Process:
There is a WIP inventory of SmarTouch XL and SmarTouch PRO products between manual assembly and labeling.
The labeling process is dedicated to both models and requires three operators.
The labeling process has a cycle time of minutes, a changeover time between products of minutes to switch labels and has a reliability of
Packaging Process:
There is a WIP inventory of SmarTouch XL and SmarTouch PRO products between the labeling and packaging process.
The packaging process requires three operators.
Packaging cycle time is minutes with a changeover time of minutes between models.
Shipments occur twice per day every hours by truck.
Employees work days each month, with two hour shifts per day, including a minute lunch and three breaks of minutes each per shift. The production control office receives orders from external customers electronically. One production supervisor monitors all production processes.
Step by Step Solution
There are 3 Steps involved in it