Question: Part 2 ( 2 0 points ) SmarTouch produces two product models: SmarTouch XL and SmarTouch PRO. The processes for manufacturing these products are identical

Part 2(20 points)
SmarTouch produces two product models: SmarTouch XL and SmarTouch PRO. The processes for manufacturing these products are identical (i.e., one value stream). SmarTouch receives 12,000 total orders for products per year from external customers. Annual demand for the SmarTouch XL is 9,000 units. The Final Assembly Department receives parts from the Main Assembly Department. Final Assembly utilizes three processes: manual assembly, labeling, and packaging.
1. Create a current state value stream map for the process flow described below. Include the inventory lead times and the process cycle times for all processes using units of minutes. (14 points)
2. Indicate the a) overall takt time in minutes, b) total process time in minutes, and c) total production lead time in minutes for this value stream (neglect changeover).(6 points)
Information about the three processes in the Final Assembly Department is detailed below.
Manual Assembly Process:
1. There is an observed work-in-process (WIP) inventory of 60 SmarTouch XL and 40 SmarTouch PRO products before manual assembly.
2. The manual assembly workstation requires nine operators and is dedicated to final assembly of both models.
3. Manual assembly cycle time is 15 minutes with a changeover time of 8 minutes between the SmarTouch XL and SmarTouch PRO, and an overall reliability of 99% for SmarTouch XL and 98% for SmarTouch PRO (i.e.,1% and 2% of products do not pass inspection, respectively, and must be sent for rework).
Labeling Process:
1. There is a WIP inventory of 30 SmarTouch XL and 20 SmarTouch PRO products between manual assembly and labeling.
2. The labeling process is dedicated to both models and requires three operators.
3. The labeling process has a cycle time of 12 minutes, a changeover time between products of 6 minutes to switch labels and has a reliability of 97%.
Packaging Process:
1. There is a WIP inventory of 20 SmarTouch XL and 10 SmarTouch PRO products between the labeling and packaging process.
2. The packaging process requires three operators.
3. Packaging cycle time is 8 minutes with a changeover time of 6 minutes between models.
4. Shipments occur twice per day (every 12 hours) by truck.
Employees work 20 days each month, with two 9-hour shifts per day, including a 30-minute lunch and three breaks of 20 minutes each per shift. The production control office receives orders from external customers electronically. One production supervisor monitors all production processes.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!