Question: Part 5 : ( 4 marks ) A drilling machine at Roof Engineering Company has a pile of on average 6 0 parts that needs
Part : marks A drilling machine at Roof Engineering Company has a pile of on average parts that needs drilling work. A new part that also needs drilling work is being added to that pile every minutes. Same arival pattern was observed for the parts that are already in the pile.
For how long, a part shall be in the pile before it is drilled?
Hint: Little's Law: Imventony Throughput rateCycle time
Answer: