Question: part b and c (a) Eight shift data from Automark Automotive Company Sdn Bhd were collected and presented in Table 2. The data was observed

part b and c
(a) Eight shift data from Automark Automotive Company Sdn Bhd were collected and presented in Table 2. The data was observed based on the stamping machine line that has four presses machine. The press is a tool in the folding material of main car body to form from the metal sheet through heavy pressing for different shapes. As engineer, you were tasked to observe and report the overall average OEE from all shifts. Table 2 Date Reduced Yield (Ton Output (Ton) 01-07 Sept. 08-15 Sept. 15-22 Sept. 23-30 Sept. 1-8 Oct. 09-16 Oct. 17-24 Oct. 25-31 Oct. Working time (Minute) 10080 11520 10080 11520 11520 11520 11520 10080 Planed Failure Down & time Repair (Minute) (Minute) 1440 330 0 440 0 555 720 300 0 0 0 600 0 0 0 540 Set Up & Adj (Minute) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Reject & Rework (Ton) 0 0 0 0 0 0 0 0 1328.82 1568.49 1591.03 592.82 1138.48 1448.6 87.6 Shut down (Minute) 495 1500 60 6930 4320 2340 10980 2460 1115.8 (b) From 3a), analyse all the parameters that contribute to OEE percentage, justify your answer What is your conclusion from this reported data and suggestion based current average OEE from all shifts (d) According to Six Big Losses criteria in improving OEE, list out possible losses, causes and action need to be taken to immediate improvement for current OEE. (a) Eight shift data from Automark Automotive Company Sdn Bhd were collected and presented in Table 2. The data was observed based on the stamping machine line that has four presses machine. The press is a tool in the folding material of main car body to form from the metal sheet through heavy pressing for different shapes. As engineer, you were tasked to observe and report the overall average OEE from all shifts. Table 2 Date Reduced Yield (Ton Output (Ton) 01-07 Sept. 08-15 Sept. 15-22 Sept. 23-30 Sept. 1-8 Oct. 09-16 Oct. 17-24 Oct. 25-31 Oct. Working time (Minute) 10080 11520 10080 11520 11520 11520 11520 10080 Planed Failure Down & time Repair (Minute) (Minute) 1440 330 0 440 0 555 720 300 0 0 0 600 0 0 0 540 Set Up & Adj (Minute) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Reject & Rework (Ton) 0 0 0 0 0 0 0 0 1328.82 1568.49 1591.03 592.82 1138.48 1448.6 87.6 Shut down (Minute) 495 1500 60 6930 4320 2340 10980 2460 1115.8 (b) From 3a), analyse all the parameters that contribute to OEE percentage, justify your answer What is your conclusion from this reported data and suggestion based current average OEE from all shifts (d) According to Six Big Losses criteria in improving OEE, list out possible losses, causes and action need to be taken to immediate improvement for current OEEStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
