Question: Part B Wht In t ? For this task, you will need to refer to the le Assessment Task Worksheets - Medium Rise Structures@ and

Part B Wht In t ? For this task, you will need to
Part B Wht In t ? For this task, you will need to refer to the le Assessment Task Worksheets - Medium Rise Structures@ and complete the following: On the drawing 8168_H06B, sketch the water reticulation layout for the apartment level, including supply and connection using a bulk storage hot water system located in the basement, metered and billed to the body corporate. On the drawing 8168_U06B. sketch out the sewerage connection and layout for the apartment level, ensuring your sketch meets regulations and standards. On the drawings 8168_MOSB sketch the mechanical air ventilation and distribution system you intend to implement for the supermarket. This must be appropriate to building design and complementary to other services. On the Drawing 8168_E06B sketch in the wiring for the consumer mains to each apartment, wiring for public lighting and the wiring exit/emergency lighting. In the underground car park drawing for 8168_U04B, you are required to sketch in a WC near the water tank. It needs its own small waste treatment plant, as it is situated below the level of the local authority sewer. Include notes on how the system would be connected to the sewer system and how the stormwater would be connected to the W1C. Once you have completed these tasks, take photographs of your sketches for submission. You must keep your sketches until further notice, as you may be asked for further explanation of your sketches by your trainer/assessor

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!