Question: Part e) and f) 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six

Part e) and f)
3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes. 0.43 0.48 152 Element Performance rating 85% 10.44 05 046 100% 1.5 149 110% 10.84 0.89 0.77 0.85 95% 1.1 1.08 1.16 1 1.26 Machine broke down. a) Determine the average cycle time for cach element b) Compute the normal time for each element c) Assuming an allowance factor of 15% of job time, compute the standard time for this task. d) Assuming an allowance of 15% of the work time, compute the standard time for this task e) How many parts are expected to be produced in an 8-hour shift? 1) What would be the range of the parts that would be produced in an 8 hour shift based on the normal time, assuming that the time that is required to complete each cycle is independent. 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes. 0.43 0.48 152 Element Performance rating 85% 10.44 05 046 100% 1.5 149 110% 10.84 0.89 0.77 0.85 95% 1.1 1.08 1.16 1 1.26 Machine broke down. a) Determine the average cycle time for cach element b) Compute the normal time for each element c) Assuming an allowance factor of 15% of job time, compute the standard time for this task. d) Assuming an allowance of 15% of the work time, compute the standard time for this task e) How many parts are expected to be produced in an 8-hour shift? 1) What would be the range of the parts that would be produced in an 8 hour shift based on the normal time, assuming that the time that is required to complete each cycle is independentStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
