Question: Petroleum Engineering Economics Please I need a solution within 1 hour Q1) One of the petroleum company is to develop their investment in on existing

Petroleum Engineering Economics

 Petroleum Engineering Economics Please I need a solution within 1 hour

Please I need a solution within 1 hour

Q1) One of the petroleum company is to develop their investment in on existing wells, they have 2 projects are available to investment as part of situation existing petroleum wells the data of each project as in the table: Project A:r=8% Project B: r=8% year cash flow (CF) cash flow (CF) -2120 -2500 600 900 820 1000 3 980 1150 0 1 2 The main Requirements: A) Accounting of NPV for the specific mentioned r for each projects as mentioned above? B) Find out IRR results fom range of its percentages from (5%-20%)? Find the final results for at least three different types of percentage for each project? C) based on your calculations which one of your IRR (%) which is making NPV is very close of Zero. D) Drawing all the above results between IRR and NPVs for both projects? E) Evaluating which one of the project within more benefits of investment according to all calculation procedure

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!