Question: Pipe Estimating Fill in the vellow boxes For the pipe isometric below, fill in the following table and determine the amount of manhours and cost

Pipe Estimating
Fill in the vellow boxes
For the pipe isometric below, fill in the following table and determine the amount of manhours and cost associated with installing the isometric.
FAERICATION
OESCRIPTION
12. SchAOS PLPe Sals BE. SS ASTM A312
22
2-304 TMRD Plpet, CI 2000 SS, ASTI A1182-F304304L. USS 59-97
32- SchHOS ELCOw 90 deg. LR BU SS ASTN
4 A. THRD SS. AST 816.9
5 ROUNO Or HEX HEND, ASSE 816.11 AND QUIDE.
ERECTION
DESCRIPTION
N.S.(Ln)
22
Notes.
This is a small bore spool ((:2''} diameter, so installation is considered to belong to an all-in rate. You only need to takeoff the pipe linear feet.
\table[[,Size,Qty,Mhr/Unit,Manhours,Cost/Mnhr,Cost ($)],[SB Pipe Footage (Through Length),2'',,2.45MHLP,9.8,$63.00,$617.40
Pipe Estimating Fill in the vellow boxes For the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!