Question: pl 2. A job was timed for ish was timed for 60 cycles and had an average of 1.2 minutes per piece. The performance rating


pl 2. A job was timed for ish was timed for 60 cycles and had an average of 1.2 minutes per piece. The performance rating 33 95 percent, and workday allowances are 10 percent. Determine each of the following: 2. Observed time. b. Normal time. c. Standard time. The abooriad times and nerfor- 5 Given these observed time se observed times (in minutes) for five elements of a job, determine the observed time (OT) reach element. Note: Some of the elements occur only periodically. CYCLE Element 6 I 3 2.1 3.4 1.4 2 2.0 3.5 1.4 3 2.2 3.5 1.5 4 2.1 3.5 1.5 5 2.1 34 1.5 5
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
