Question: Pl ans 1,2,3, the Case Study advanced Project Management MS Project 2016 Introduction: British Petroleum which is oil and Gas Company had to face situation

Pl ans 1,2,3, the Case Study advanced Project Management MS Project 2016
Introduction: British Petroleum which is oil and Gas Company had to face situation which was not just critical but new for any oil company. The incident occurred due to explosion in the deep-water horizon while BP technical staff was trying to drill a well. Moreover, BP was not able to stop oil flow for threemonths. In ioday's dynamic and ever changing situation have forces the business organization to adopt and implement the new strategies as it is necessary to survive in the ever changing and competitive environment. In this case study we will analyse the situation of BP Oil Spill in Gulf of Mexico situated in United States of America. This oil spill results in a situation which is not only critical but also new for any oil company in the world. As this deep oil spill accident was one of the worst disasters ever cost in the history of modern era. Such situation required some extremely crucial strategic management decisions. In the end we will discuss about the strategic management that can lead to a better solution of the issue. Background of British Petroleum(BP): British petroleum (BP) founded in 1909 as the Anglo-Persian oil and Gas Company headquartered in London England, United Kingdom. It's a sixth largest O\&G Company by production and fifth largest company by annual revenue [2].Its major field of operations are exploration, production, refining, distribution and marketing of the hydrocarbon products. BP operating in over 80 countries of the world having over 80,000 employees. Its largest division is operating in America under the name of BP America and it's the second largest oil and gas production company in the United States. It has 22400 service stations selling about 5.9 million barrel per day [3]. It is one of those oil and gas companies who have invested heavily for the invention and adoption of new exploration technology to find petro chemical under the earth surface.. Problem: April 2010, in the region of Gulf of Mexico situated 52 miles southeast of the Louisiana port of Venice an explosion occurred in the Deep-Water Horizon project. This explosion cause the oil spill which was one of the worst ever oil disaster in the history of the modern world. This incident results the loss of 11 worker's lives. The fire caused the clouds of smoke covered 30 miles area while the 5 miles radius around the rig was contaminated by the spill oil [4]. The situation changed so rapidly that the well head remains open resulting in substantial amount of oil spill eliminating the aquatic life of the region with estimated death tool of 8000 animals. After many unsuccessful attempts BP was able to cap the well on 15 July stopping the oil flow. The Deep-Water Horizon was 9 years old unit specially designed for the offshore, drilling. It was a 2 Scanned by CamScanner 3 flassive floating structure with the capability to operate up to the 2400 meter deep and its drilling capability was 9100 meter. The structure was manufactured by the heavy industry department of Hyundai. BP was using this semi-submersible drilling unit by leasing it from Transocean from March 2008 to September 2010. BP took the period of three months to completely cease the oil flow into the ocean on 15 th July but up to this time 4.9 million barrels of oil which is approximately equal to 780 million litres has been spilled into the ocean. During the span of three month almost 210,000 gallons of hydro chemical leaked on daily basis in Gulf Ocean. This oil spilled caused the adverse effect on the eco system which disturbed the 40% sea food supply in United States. The US Government was quick to response and Obama announced $20 billion fund as a response to cater the environmental disaster. BP also acknowledged the situation admitting that it will pay for the clean-up cost. Over 30,000 people worked across the coast to collect the oil, took primitive measures to save the lives of animals but unfortunately disaster was so critical that the effect of spill still effecting the environment. Question 1: In the view of above case study provide the possible reasons for Project Failure for British Petroleum? 10 Marks Question 2: What would be your suggestion to British Petroleum to overcome such type situation of Project Failure? 10 Marks Question 3: What is your final conclusion in above case study? 5 Marks
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
