Question: Please also answer these: B.) The bottleneck time is ??? minutes per unit (round up to two decimal places) C.) What is the throughput time
Please also answer these:
B.) The bottleneck time is ??? minutes per unit (round up to two decimal places)
C.) What is the throughput time of the overall system
D.) If the firm operates 8 hours a day, 20 days per month, what is the monthly capacity of the manufacturing process?
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which a one of the three assembly operations (the operations are in parallel). 5 units/hr 5 units/hr Assembly 0.7 units/hr Sawing Sanding Assembly Welding 2 units/hr Drilling 0.7 units/hr 2.4 units/hr Assembly 0.7 units/hr a) is the bottleneckStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock