Question: please answer accordingly and do up to 39 rows before calculating cycle for both machines.Average cycle and the utilisation of the operator as well as

please answer accordingly and do up to 39 rows before calculating cycle for both machines.Average cycle and the utilisation of the operator as well as the two machines
QUESTION 4 4.1 An operator is tasked to operate two (2) machines instead of one (1). (6) 4.1.1 Use the given information to complete a multiple activity chart. Note: Load time = 4 minutes Machine Unload time = 2 minutes Running time = 6 minutes Draw the table below on your answer sheet. MULITPLE ACTIVITY CHART: Time (min) Operator Machine 1 1 2. 3 4 5 6 7 8 9 co000Step by Step Solution